Tyler Bricks

Sources and methods

Every claim on this site is one fact from a shared, fact-checked set, and every fact carries its sources. Here they are, with how the facts were checked and how the drawings, the charts and the map were made.

How the facts were gathered

The first set of facts was collected and checked by September 29, 2026. Four researchers each gathered sourced claims on one subject; a fact checker then reopened every source and marked each claim verified, corrected, unverified or false. Only verified or corrected statements are used, in the corrected wording.

A second pass, in October 2026, went deeper on the brick streets: the National Register nominations read in full, the Sanborn maps read at full resolution, and city and newspaper reports from 2013 to 2026. Every claim carries the sentence in its source that supports it, and an independent checker reopened each source before it was kept. 64 of the facts here come from that pass.

Dated numbers carry their year. Where sources disagree, the sentence says so and gives both. The notes at the foot of each page give each fact as worded, with what a reader should know beside it and its sources.

This site uses 79 facts, from 48 linked sources, and 18 archive pictures, each listed with its rights on Picture credits.

The sources

KLTV kltv.com

Texas Historical Commission Atlas (National Register documents and markers) atlas.thc.texas.gov

Tyler Morning Telegraph tylerpaper.com

Library of Congress loc.gov

Historic Tyler historictyler.org

KETK digital-release.ketk.com

Tarleton State University tarleton.edu

YouTube youtube.com

Wikipedia en.wikipedia.org

KNUE knue.com

Living New Deal livingnewdeal.org

Handbook of Texas (Texas State Historical Association) tshaonline.org

Every fact used

  1. 1897

    Thurber's brick plant in Erath County, about 75 miles west of Fort Worth, opened in 1897, began making vitrified paving brick in 1898, made only pavers by 1911, and closed around 1930–31. The closing date is approximate: sources give 1930 (the Handbook of Texas, Tarleton’s Gordon Center) or 1931 (the state marker, Tarleton’s Industrious Historian).

    On BR-1 Tyler's brick streets, BR-4 Timeline, BR-5 Where the bricks came from

  2. 1897

    The state marker at Thurber says manager W. K. Gordon persuaded company president R. D. Hunter to build the brick plant in 1897; it began with three Ross-Keller presses driven by a Corliss steam engine nicknamed 'Old Hunter,' covered five acres and employed 800 men.

    On BR-5 Where the bricks came from

  3. 1897

    The Thurber plant opened as the Green and Hunter Brick Company and was making 30,000 bricks a day by November 1897; a Tarleton history later puts output at a reported 80,000 bricks a day. The two daily figures likely describe different years; neither source says when 80,000 was reached.

    On BR-5 Where the bricks came from

  4. 1905

    In his 1905 annual message, Mayor John Bonner said Tyler's streets were in the best shape they had ever been, but that total satisfaction would not come until they were paved.

    On BR-4 Timeline

  5. 1906

    According to the National Register nomination, brick paving in Tyler began in 1906 with railroad crossings paved in red brick from Thurber, Texas; the streets around the courthouse followed in 1907, and Oakwood Street from Broadway to the depot in 1908. This is the National Register nomination’s account. Another account dates the first brick streets to around 1912, so the paving is dated here from the early 1900s into the 1940s, with no single start year.

    On BR-1 Tyler's brick streets, BR-5 Where the bricks came from

  6. 1906

    According to the city's 2000 multiple-property survey, Tyler's first paving began on July 2, 1906, when contractors Allen and Harrison laid red brick from Thurber, Texas, at railroad crossings. The Tyler Morning Telegraph, citing city data in 2015, puts the first brick streets around 1912, so no single start year is given here.

    On BR-3 In the maps’ own words, BR-4 Timeline, BR-5 Where the bricks came from

  7. 1906

    The 2000 National Register survey of Tyler says heavy rains from December 1904 to August 1905 made a mire of the streets, and that four weeks of snow and rain in January 1906 gave them 'a muddy and dilapidated appearance about which frogs are not the only croakers,' a line it cites to the mayor's annual messages.

    On BR-4 Timeline

  8. 1907

    The Sanborn fire insurance map of Tyler dated September 1907 says on its first sheet: 'Grades generally level. streets not paved.' The 2000 National Register survey and the 2003 Brick Streets nomination say the streets around the courthouse square were paved in 1907, and the survey dates the first paving, at the railroad crossings, to July 2, 1906. The record does not reconcile them.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words

  9. 1907

    Sources disagree on 1907: the Sanborn map of Tyler dated September 1907 says 'streets not paved,' while the 2000 National Register survey and the 2003 Brick Streets nomination say the streets around the courthouse square were paved in 1907 with Mineral Wells brick. Neither source gives a month for the square, so the two may describe different points in 1907. The same 2000 survey dates the first paving, at the railroad crossings, to July 2, 1906.

    On BR-3 In the maps’ own words, BR-4 Timeline, BR-5 Where the bricks came from

  10. 1908

    The 2000 survey says paving continued in 1907 and 1908, 'extending pavement as far east on Oakwood Street as the Cotton Belt depot'; the 2003 Brick Streets nomination dates the Oakwood paving from Broadway to the depot to 1908. Neither says what material was used. The depot’s own National Register nomination (2000) says its brick parking area was likely paved when East Oakwood was paved “prior to 1925.”

    On BR-4 Timeline

  11. 1912

    The Sanborn map of Tyler dated February 1912 says on its first sheet: 'About one mile of brick paved streets.' It fits neither start date cleanly: the 2000 survey dates the first paving to 1906 and the square to 1907, and city data reported in 2015 puts the first streets around 1912.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words, BR-4 Timeline

  12. 1919

    The Sanborn map of Tyler dated August 1919 says on its first sheet: 'Streets in business section mostly paved with brick and asphalt. Others are in fair condition.' City Manager V. W. Prater wrote in 1923 that only about 5 of Tyler’s 130 miles of street were paved.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words, BR-4 Timeline

  13. 1923

    In September 1923, City Manager V. W. Prater wrote in the Courier Times that Tyler had about 130 miles of street and only about 5 miles were paved.

    On BR-3 In the maps’ own words, BR-4 Timeline

  14. 1923

    Prater's 1923 article complained: 'We call Tyler the metropolis of East Texas but still we are content to pull around in sand and chugholes in dry weather, mudholes in wet weather.'

    On BR-4 Timeline

  15. 1925
  16. 1925

    The Tyler Morning Telegraph reported in 2015 that Tyler voters passed a bond in 1925 to build 15 streets on top of a base of 11 already built, and that newspapers at the time called it 'the largest public improvement project ever launched in the city of Tyler' and 'the beginning of new Tyler.' No source we have found gives the bond’s amount or the date of the vote.

    On BR-3 In the maps’ own words, BR-4 Timeline

  17. 1925

    In the Brick Streets district, portions of many streets that were originally dirt were paved with red brick beginning in the mid-1920s; the nomination dates the district's brick streets to about 1925 to 1940. Districts differ: the Charnwood nomination’s inventory dates its brick streets about 1910 to 1925, earlier than the Brick Streets and Azalea inventories (about 1925 to 1940).

    On BR-4 Timeline

  18. 1928

    The Sanborn map of Tyler dated March 1928 says on its first sheet '18½ MILES OF PAVING,' without naming the material. The figure counts all paving, not only brick. In 1923 the city manager counted about 5 paved miles.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words, BR-4 Timeline

  19. 1930

    Demand for brick paving fell as cities chose cheaper asphalt, and the Thurber brick plant closed after the 1929 crash: in 1931 according to the state marker and Tarleton's Industrious Historian, in 1930 according to the Handbook of Texas and Tarleton's Gordon Center.

    On BR-4 Timeline, BR-5 Where the bricks came from

  20. 1934

    In 1934 South Donnybrook Avenue between Frazier and Rix streets was paved with red brick as a Civil Works Administration project.

    On BR-4 Timeline

  21. 1935

    The Brick Streets nomination says that in 1935 more than 1,400 families were on county relief, that 'most were unskilled laborers and agricultural workers and it was these men who were employed in local WPA and PWA projects,' and that those programs' work included paving streets. The nomination does not tie these men to particular streets.

    On BR-4 Timeline, BR-6 Who laid them

  22. 1935

    In the mid-to-late 1930s the Civil Works Administration, Public Works Administration and Works Progress Administration paved Tyler streets in both brick and asphalt, according to city engineering records. The nomination calls the PWA the “Progress Works Administration”; the agency was the Public Works Administration.

    On BR-4 Timeline, BR-6 Who laid them

  23. 1935

    The Charnwood nomination says Houston Street between Broadway and the Mo-Pac right-of-way and portions of Donnybrook were paved in the 1930s, and that the federally funded Civil Works Administration 'provided labor to complete Houston and South Donnybrook in the mid 1930s.'

    On BR-6 Who laid them

  24. 1938

    The 1938 Sanborn atlas of Tyler says on its report page 'Paving:—About 37 miles,' without naming the material. The line is on the atlas’s report page, not sheet 1, and counts all paving, not only brick. The 2000 survey says about 20 miles of brick streets were completed by about 1942.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words, BR-4 Timeline

  25. 1938

    The Charnwood nomination, citing city engineering files, says East Dobbs Street was paved with red brick in 1938 as a Public Works Administration project (its description section says East Dobbs was surfaced within five years of 1925); East Dobbs is one of three Charnwood streets that keep original brick.

    On BR-4 Timeline

  26. 1938

    The East Ferguson nomination (2001) says East Ferguson Street, which runs east from the north side of the courthouse square, was paved by 1938, citing Smith County deed records, 'with the red brick still in place.' The nomination’s text places the street outside the district’s boundary, while its inventory lists it as a contributing brick street.

    On BR-4 Timeline

  27. 1938

    Not every street got brick: the Short-Line nomination says Short Street, about five blocks northwest of the courthouse square, was paved with asphalt by 1938, citing deed records.

    On BR-4 Timeline

  28. 1942

    The 2000 survey says about 20 miles of brick streets were completed up to about 1942, when World War II diverted funds and manpower, and that by then residents were no longer routinely choked by dust or mired in mud; the Tyler Morning Telegraph (2015), citing city data, says brick streets were installed through 1947.

    On BR-1 Tyler's brick streets, BR-3 In the maps’ own words, BR-4 Timeline

  29. 1942

    By 1942 Tyler had applied for and received 31 federal or state public-works grants, among them brick and concrete paving for dozens of streets, and funded 25 more projects with tax money and property-owner assessments.

    On BR-4 Timeline

  30. 1950

    The Brick Streets (2003) and Azalea (2002) nominations say asphalt replaced brick as Tyler's paving material of choice in the 1950s; the city's figures reported in 2015 put the last brick streets in 1947.

    On BR-4 Timeline

  31. 1999

    The Charnwood Residential Historic District became Tyler's first National Register historic district on August 20, 1999; it covers 12 blocks and has 208 contributing properties, its brick streets among them.

    On BR-2 The brick streets on a map, BR-4 Timeline

  32. 2001

    Beside the 1905 Cotton Belt depot, a brick-paved parking area that extends Oakwood Street and a brick sidewalk in front of the depot are contributing features of its National Register listing.

    On BR-4 Timeline

  33. 2003

    Around 2000-2003 the National Register documents said only about seven miles of red brick streets remained in Tyler, much of it in central residential areas. Later city figures are higher: about 15 miles (2013), 13.8 (2015), 13 (2023). The 2015 report notes that brick also survives under asphalt; no source reconciles the counts.

    On BR-3 In the maps’ own words, BR-4 Timeline

  34. 2004

    The Brick Streets Neighborhood Historic District, listed on the National Register in 2004, covers 29 blocks about half a mile south of Tyler's original town square, and all or part of 11 of its 14 streets keep their original red brick paving.

    On BR-1 Tyler's brick streets, BR-2 The brick streets on a map, BR-4 Timeline

  35. 2004

    The Texas Historical Commission's Atlas gives the Brick Streets district's National Register listing date as April 28, 2004. Historic Tyler, Inc. gives January 2004.

    On BR-4 Timeline

  36. 2013

    In 2013, City of Tyler planner Heather Nick told KLTV that the brick streets were built 'predominantly by African American men,' and a city film shows the crews laying bricks assembly-line style in real time. The film is described only as showing assembly-line style work, not how the bricks were laid.

    On BR-1 Tyler's brick streets, BR-4 Timeline, BR-6 Who laid them

  37. 2013

    In May 2013 city planner Heather Nick told KLTV the brick streets 'were constructed back in the 30's and 40's' and that Tyler had 'about 15 miles of brick streets.' Her dating is narrower than the National Register’s (paving from 1906) and the city’s 2015 figures (through 1947), and her 15 miles differs from 13.8 (2015), 13 (2023) and about seven (2000–03).

    On BR-4 Timeline

  38. 2013

    The City of Tyler showed its film of brick street construction to schoolchildren, who thought it was sped up; planner Heather Nick said it was real time.

    On BR-6 Who laid them

  39. 2014

    In 2014 the Tyler Morning Telegraph gave the city about 26,000 bricks it dug up while building a parking lot on Erwin Street, where a street once ran.

    On BR-7 The lift

  40. 2015

    As of 2015, the city counted nearly 14 miles (13.8) of brick streets made of about 12.6 million bricks, of three types no longer manufactured, so repairs draw on stockpiled bricks. Counts differ by year and source: about 20 miles of brick by about 1942 and about seven in 2000–03 (National Register documents), about 15 in 2013 (a city planner), 13 in 2023 (the city).

    On BR-1 Tyler's brick streets, BR-4 Timeline, BR-7 The lift, BR-8 Lay a street

  41. 2015

    Because the old bricks are a finite resource, the city requires utility crews to lift them one by one and stack them for city workers to relay, and as of 2015 a dedicated three-person city crew repaired brick streets by hand.

    On BR-1 Tyler's brick streets, BR-4 Timeline, BR-6 Who laid them, BR-7 The lift, BR-8 Lay a street

  42. 2015

    The Tyler Morning Telegraph reported in 2015 that some original brick streets had been paved over with asphalt but kept the brick beneath, and that the bricks were the sub-base for numerous old-town streets, including downtown portions of Broadway.

    On BR-4 Timeline

  43. 2015

    Streets operations manager Robin Smart described brick repair in 2015 as 'a young man's job,' done mostly with picks and shovels and on one's knees laying bricks.

    On BR-7 The lift

  44. 2015

    Streets operations manager Robin Smart estimated in 2015 that about 10 percent of each brick is lost every time it is disturbed, and said how long the city's stockpile lasts depends on the number of utility cuts and infrastructure projects.

    On BR-7 The lift

  45. 2015

    In 2015 the Tyler Morning Telegraph reported that brick repair cost $7 to $17 a square foot, against about 35 cents for a seal coat and about $1 for an asphalt overlay, and that the city had spent about $47,000 on brick repairs so far that year (as of mid-August).

    On BR-7 The lift

  46. 2015

    In 2015 the city gave two main reasons for brick street repairs: utility cuts and 'level ups' that flatten sagging areas.

    On BR-7 The lift

  47. 2015

    In 2015 city crews relaid bricks on fresh sand and sealed them with dyed concrete, mixed in the city's own hopper, so repaired streets would not look like a patchwork quilt, the Tyler Morning Telegraph reported.

    On BR-7 The lift

  48. 2021

    On July 14, 2021, the city council approved restoring brick at 43 utility cuts that had been patched with asphalt, a project of nearly $100,000 from the General Fund and Street Commitment Fund.

    On BR-4 Timeline, BR-7 The lift

  49. 2021

    KLTV reported in September 2021 that the city had frozen its Brick Street Operator position in 2021 budget cuts and the streets had gone a year without maintenance because of the pandemic; Mayor Don Warren made a three-man brick crew a priority, the position was to reopen October 1 with the new budget, and the city had another $350,000 with a contractor for larger reconstruction.

    On BR-4 Timeline, BR-7 The lift

  50. 2021

    Mayor Don Warren said in July 2021: 'They are a part of our culture and our heritage and when people come to Tyler, one of the things they really look at are our brick streets.'

    On BR-7 The lift

  51. 2022

    In May 2022 the city decided to rebuild two brick streets, South Thompson Avenue and Barger Street, in asphalt after a 2020 storm sewer collapse, stockpiling their bricks for repairs elsewhere.

    On BR-4 Timeline

  52. 2023

    In July 2023, the Tyler City Council approved an $873,961 contract with Crown Civil Construction to rehabilitate 21,355 square feet of brick streets and rebuild Bois D'Arc Avenue from South Oakwood Street to the railroad tracks; by April 2024, 35 sites had been repaired. The city’s 2023 repair list has 35 numbered rows, two of them marked N/A with no area, so 33 sites with an area to repair.

    On BR-2 The brick streets on a map, BR-4 Timeline, BR-7 The lift

  53. 2023

    In July 2023 KETK reported that the Street Maintenance Department identified areas of 'the 13 miles of brick streets around the City' that need repair, while KLTV's version of the same release said '13 miles of brick street were identified as needing repair.'

    On BR-3 In the maps’ own words, BR-4 Timeline

  54. 2023

    The city's '2023 Brick Streets Repairs' list attached to KETK's July 26, 2023 story has 35 numbered rows, two of them 'N/A' with no area, so 33 repair sites; their areas add up to 21,355 square feet, the figure KLTV and KETK reported, and the largest was 2,750 square feet at 902 South College Avenue, at the Dobbs and College intersection. The total is the sum of the list’s square-foot column, read from a scanned table; it matches the contract figure KLTV and KETK reported.

    On BR-4 Timeline, BR-7 The lift

  55. 2023

    The 2023 repair list includes brick repair sites at 1410 North Bois d'Arc Avenue (northwest corner at West Cedar), 800 North Border Avenue (north of West Bow), 210 Goodman Street, 201 East Oakwood Street and 303 South Oakland Avenue (south of East Mulberry). A repair site shows brick at that spot in 2023, not how much of the street is brick.

    On BR-7 The lift

  56. 2023

    Announcing the 2023 Brick Streets Project, paid for from the Street Commitment Fund, Streets Manager Sara McCracken said it was 'an essential step towards restoring the City's historical neighborhoods brick by brick' and that the bricks are laid and leveled by hand.

    On BR-7 The lift

  57. 2023

    When the 2023 repairs were announced, KETK found residents divided: some said the brick streets preserve Tyler's history, others that the bricks should be picked up and packed away.

    On BR-7 The lift

  58. 2025

    In September 2025, crews took up every brick on College Avenue between Ferguson and Erwin streets for the Downtown Improvement Project, palletized and stored them.

    On BR-1 Tyler's brick streets, BR-4 Timeline, BR-7 The lift

  59. 2025

    On Saturday, September 20, 2025, bricks lifted for the downtown project were given away free at Broadway and Ferguson starting at 7 a.m., and all were taken within about an hour; KLTV reported the bricks were made in Missouri. KLTV does not say how it knows where the bricks were made, or which street they came from. The National Register documents name the Thurber Brick Co., the Mineral Wells Brick Co. and the Tyler Brick Co. as Tyler’s suppliers, so “Missouri” is treated here as unverified.

    On BR-4 Timeline, BR-7 The lift

  60. 2025

    Tyler's streets mix several kinds of old brick: the streets manager counted three types, none still made, in 2015, and the city's Main Street director said in 2025 that four types were in the downtown project area alone.

    On BR-5 Where the bricks came from, BR-7 The lift

  61. 2025

    The Downtown Improvement Project began in September 2025, converts the streets around the square to two-way traffic, rebuilds the square with green space (due by May 2027) and restrooms, and later adds roundabouts on South Broadway starting November 2027.

    On BR-7 The lift

  62. 2025

    When crews began lifting College Avenue's bricks one by one in September 2025, Main Street director Amber Varona said the street would get a level base and concrete headers to mark lanes and keep the bricks from moving.

    On BR-7 The lift

  63. 2025

    Jesse Wilson of contractor Precision Civil called the downtown brick removal 'a very bittersweet project' and said he kept a brick himself as a memento.

    On BR-7 The lift

  64. 2025

    In November 2025 crews on the downtown sewer project were taking up the bricks on West Elm Street between College and Broadway and laying temporary asphalt, with Bois D'Arc Avenue next.

    On BR-7 The lift

  65. 2026
  66. 2026

    Rebuilt College Avenue and Erwin Street reopened to two-way traffic on Wednesday, June 3, 2026, after a ribbon cutting the Friday before. The day is worked out from the article’s June 4, 2026 publication and its “Wednesday.”

    On BR-4 Timeline, BR-7 The lift

  67. 2026

    In mid-July 2026 crews began setting the old bricks back on West Ferguson Street after laying new water and sewer lines and a concrete base.

    On BR-4 Timeline, BR-7 The lift

  68. 2026
  69. 2026

    By mid-March 2026 the brickwork on the rebuilt block of College Avenue was mostly done, according to downtown specialist Lindsey Froneberger.

    On BR-7 The lift

  70. 2026

    Defending downtown construction delays in April 2026, Mayor Don Warren blamed what lay under the old bricks: 'When you dig down under bricks that have been there 100 years, you're going to come across stuff you're not expecting.'

    On BR-7 The lift

  71. Undated

    Tyler's paving brick came from the Thurber Brick Co. and the Mineral Wells Brick Co., with some from the local Tyler Brick Co., which paving contracts saved from bankruptcy. The sources name the companies only: none we have verified describes maker’s marks on Tyler’s bricks, or how the streets were laid.

    On BR-1 Tyler's brick streets, BR-5 Where the bricks came from

  72. Undated

    Accounts of Tyler's brick streets disagree on the start: one puts the first brick streets at around 1912, while the National Register nomination dates brick paving to 1906. The two dates are not reconciled in the sources, so neither is given here as the start.

    On BR-1 Tyler's brick streets, BR-4 Timeline

  73. Undated

    Edna Pollard, newly arrived and living on South Broadway, remembered: 'Broadway was a wide, dirt street and a mountain of churned up dust rolled over us every time a car passed.' The survey does not date her memory; it sets it in the early 1920s, just before the city manager’s 1923 article.

    On BR-4 Timeline

  74. Undated

    The Azalea nomination (2002), citing Tyler Today (Fall 1994), says Rudolph Bergfeld (1855-1930) is credited with 'paving Chilton and College with brick ... using his own staff labor and funds.' The nomination gives no year and no blocks.

    On BR-4 Timeline

  75. Undated

    The 1994 state marker at the Thurber brick plant site says Thurber brick paved roads throughout Texas, including the old Bankhead Highway (U.S. 80), Austin's Congress Avenue, Fort Worth's Camp Bowie Boulevard and the Galveston Seawall.

    On BR-5 Where the bricks came from

  76. Undated

    Thurber's ads in the Texas Almanac said its paving brick was used in Fort Worth, Dallas, Houston, Galveston, Beaumont 'and other cities of the South.' The list does not name Tyler; Tyler’s use of Thurber brick comes from the National Register documents.

    On BR-5 Where the bricks came from

  77. Undated

    The 2000 survey includes an undated Smith County Historical Society photo of a road crew on Dobbs Street between Augusta and Kennedy, used to illustrate the New Deal-era paving of dozens of streets.

    On BR-6 Who laid them

  78. Undated

    The construction film is posted on the City of Tyler's YouTube channel as 'Tyler's famous Brick Streets,' and the Tyler Morning Telegraph posted a cut titled 'Found Footage Construction Of Tyler's Brick Streets.' No source we have found gives the film’s year, maker or streets.

    On BR-6 Who laid them

Methods

  1. The dots. Each dot on the home page stands for 1,000 bricks: 12,600 dots for the city's 2015 count of about 12.6 million. They are set in blocks of 1,000, so twelve blocks are full and the thirteenth is six-tenths full. The figure is a count from 2015, not a live tally; the dots imply nothing about how any street was laid. The number beside them is plain text and never animates.
  2. The maps’ own words. The Sanborn lines were read on the sheets at full resolution through the Library of Congress’s image service, and each is quoted with the sheet’s own spelling and capitals. The pictures on The maps are crops of those sheets, taken from the same service by a script, at the sheet’s own resolution for the lines; nothing in them is retouched, and every one links to the whole sheet. The 1928 and 1938 figures count all paving, not brick alone, and the bars say so by their hatch. Two rows in that chart are not from the maps and say so: the city manager’s 1923 figure and the 1925 bond.
  3. The missing miles. Each figure is drawn on one scale, with its year and its source, and the figures are never joined by a line: each comes from a different document, counted in a way the documents do not explain, and no source reconciles them. The 2022 and 2025 rows mark streets the city said it would turn to asphalt, not measured losses.
  4. The smaller drawings. The 1923 grid draws Tyler’s 130 miles of street as 130 squares, 5 of them filled, as the city manager wrote. The 1925 bars are the 11 streets already built and the 15 the bond added. The 2023 squares are drawn to scale by area: the whole list and its largest site. The cost bars use the 2015 figures per square foot. The brick that loses a tenth stands for the 2015 estimate, not a measured brick.
  5. Pictures. Every map and photograph is one the shared research cleared for publication, with its rights statement word for word; Picture credits lists them all. The 1916 panorama is shown in survey-blue ink and without its card mount, and links to the original print. The photographs are resized only: never cropped, retouched or recolored. Their captions say only what their records say: “Tyler, 2016,” not a street the photographer did not name.
  6. The map. Streets tagged surface=brick or surface=bricks in OpenStreetMap, inside the box 32.28, -95.38, 32.42, -95.22, read from an Overpass API mirror (maps.mail.ru) on October 13, 2026: 45 street segments, 30 street names, about 7.2 miles of summed centerline. OpenStreetMap is mapped by volunteers; it is incomplete, it is not the city's list, and a street tagged brick may since have been relaid, lifted or covered. Its 7.2 miles and the city's 13.8 miles of 2015 are different measures from different years, and are not reconciled. The data is © OpenStreetMap contributors, under the ODbL; download it as GeoJSON.
  7. Left off the map. These ways are in the same extract and are not drawn:
    • Way 589131567, unnamed (footway, bricks): A footway, not a street.
    • Way 754331286, unnamed (footway, paving_stones): A footway tagged paving stones, which are not necessarily brick.
    • Way 897942593, North Spring Avenue (unclassified, paving_stones): Tagged paving stones, which are not necessarily brick.
  8. The base map. OpenFreeMap vector tiles (OpenMapTiles, from OpenStreetMap), drawn by MapLibre and restyled as a plan. A picture of the same map shows first and works without JavaScript. The dashed arc is half a mile from an approximate point for the downtown square: the distance the National Register nomination gives between the original town square and the Brick Streets Neighborhood Historic District. It marks a distance, not the district; neither district's boundary is drawn, because we do not have them.
  9. Thurber to Tyler. The line is the great-circle distance between two OpenStreetMap place nodes, about 182 miles (2026-10-13). It is a distance, not the route the bricks traveled, which no source we have verified describes. The sources put Thurber about 75 miles west of Fort Worth; between those two place nodes the plate measures about 65 miles in a straight line, so the two are different measures. Mineral Wells and Fort Worth are marked for reference: no source we have verified places the Mineral Wells Brick Co.'s plant, or the Tyler Brick Co. within Tyler.
  10. The timeline's key. To scale from 1895 to 2030. The paving bar fades in from 1906 to 1912 and out from 1942 to 1947, because the accounts of its start and its end differ, and the plant's bar fades out at 1930–31 because the sources give either year.
  11. The lift. An axonometric schematic of a slice of College Avenue. The sources give the stretch (Ferguson to Erwin), the steps (taken up, palletized, stored) and the relay in front of Plaza Tower on March 2, 2026. The slice's length, the number of stacks and pallets, how they were stored, and where along the street the relaid bricks fall are drawn for the idea; where the bricks were stored, and where Plaza Tower stands along the avenue, are not in the sources. The street is drawn as the hatch a plan uses for paved brick, never as a bond.
  12. The street you lay. Three arrangements, offered as a toy. None is claimed to be Tyler's: no source we have verified says how Tyler's streets were laid. The pace shown is yours, measured while you lay, and says nothing about the crews.
  13. Held back. Two talks to the Smith County Historical Society, recorded in 1977 and 1991 and kept on the Internet Archive, are known to this research only from machine transcripts. Nothing from them is used here until someone has listened to the recordings.
  14. Type. Stardos Stencil for titles and numerals, Atkinson Hyperlegible Next for everything read. Both are open-licensed (OFL) and served from this site.

What this site will not claim

  • A laying pattern (running bond, herringbone) or maker stamps for Tyler's bricks.
  • A single start year for the brick streets (say "early 1900s into the 1940s").
  • A historical photograph presented as Tyler's, without a license we can prove.
  • That the 1916 photograph of the square shows how it was paved: at its size, it does not.
  • That the bricks lifted downtown in 2025 were made in Missouri. KLTV reported it without saying how it knew.
  • That the “A. P. Exum, Contractor” stamp says anything about the brick streets. It is pressed into a concrete sidewalk.
  • The names, number or pay of the people who laid the streets.
  • The route the bricks traveled from the plants to Tyler.

What is still open

  • When in 1907 the square was paved, against the Sanborn map’s “streets not paved” of September 1907.
  • Who Allen and Harrison, the contractors of July 2, 1906, were.
  • The amount of the 1925 paving bond, and the date and count of the vote.
  • The year, maker and streets of the city’s construction film.
  • Which of the mileage counts is right (about seven in 2000–03; 15, 13.8 and 13 since), and how much brick lies under asphalt.
  • How Tyler's brick streets were laid, and whether it varied from street to street.
  • Whether any maker's marks are on the bricks, and what the three or four types no longer manufactured are.
  • Who laid the streets, by name; how many; and which crew laid which street.
  • Where the stockpile is kept and how many bricks are in it.
  • The boundaries of the Brick Streets Neighborhood and Charnwood historic districts.

Credits and corrections

Made in Tyler by Tyler Sites as a gift to the town. It is an independent project and is not affiliated with the City of Tyler. The maps and photographs are listed, with their makers and rights, on Picture credits. Icons are from Phosphor. Map data is © OpenStreetMap contributors.

If you find a mistake, or hold a record this site should cite, you can reach the studio through its site.