September 1907
“Grades generally level. streets not paved.”1
The notes under the title run through the waterworks and the fire department, and end on the streets.


1907, in two records
“Grades generally level. streets not paved.”
“In 1907 streets around the square were paved using red brick made of heat treated clay manufactured at the Mineral Wells Brick Co.”
Neither gives a month for the square, so both may be true of different points in 1907. The same survey dates the first paving, at the railroad crossings, to July 2, 1906.89